Emergency stabilisation of a storm drain in Leipzig

Baugrube Richard-lehmann-strasse

Emergency stabilisation of a storm drain, Richard-Lehmann-Straße / Wundtstraße in Leipzig

  • Solution for a damage by lining with discrete pipes
  • GPR circular profile DN 1600 SN 5000,
  • tapering cross-section 3700/2000
  • Pipe lengths up to 3.00 m, total length 145.00 m
  • Tamping of the annulus approx. 490 m³
  • Construction of a building pit with horizontal timber sheeting, depth up to 3.80 m

Rohrtransport

Notsicherung  Kanal

Kanalsanierung

Kanalsanierung Regenwasserkanal

Im Kanal

Beladung Betoneton